Measures to Reduce Errors in High-speed Weigh-In-Motion
To reduce errors caused by road factors in weighing, the following requirements should be met in the area affecting weighing before and after the weighing equipment at non-site enforcement points: 1. The longitudinal slope should not exceed 2%, and the transverse slope of the road surface should not exceed 2%; 2. When on a cement road surface, deformation joints, pull rods, and fillers should be set between backfilled cement concrete and existing cement road surfaces; 3. When on an asphalt road surface, a gradient transition should be used between backfilled cement concrete and existing asphalt surface layers. Non-site enforcement points should avoid installation on the following road sections: 1. Sections within 200 meters of a flat intersection; 2. Sections with changes in the number of lanes; 3. Overpasses (affecting aerodynamics) and ramps (unevenness) sections; 4. Sections on bridges or other structures that will have dynamic effects on vehicles; 5. Sections under high-volta...